Quarry

Belmont Quarry Overburden Stripping

In general works consists of preparing gully for overburden, vegetation clearing, strip topsoil, and excavate and haul overburden from quarry face to waste area.

Details

  • 2017 – 300,000 m3 overburden strip, and plant hire contract to cart brown rock from quarry face to quarry floor ready for loading out
  • 2015 – 170,000 m3 overburden strip and additional plant hire
  • 2014 – plant hire works – Excavator
  • 2013 – 140,000m3 and bench rehabilitation works
  • 2010 – plant hire works – operator supply
  • 2009 – 120,000 m3 overburden strip
  • 2007 – 315,000 m3 overburden strip
  • 2006 – 190,000 m3 overburden strip
  • High level of safety is maintained at the quarry.  All quarry guidelines are adhered to.

Linton Quarry Overburden Stripping

In general works consists of preparation and management of waste areas, environmental controls, and excavate and haul overburden from quarry face to waste area.

Details

  • 2013 – Labour hire
  • 2014 – March to April 2014; 47,000m3 overburden strip
  • 2014 – November 2014 to January 2015; 80,000m3 overburden strip
  • 2015 – February to April 2015; 86,000m3 overburden strip
  • 2015 – November 2015 to March 2016; 175,000m3 overburden strip
  • High level of safety is maintained at the quarry.  All quarry guidelines are adhered to.

Location
Kendalls Line, Linton

 

Otaki Quarry

In general work consists of varying earthworks roles in both the extension and maintenance of the quarry.

Details

  • 2014 April – Pit excavation with superreach excavator
  • 2014 June – Haul road grading and general maintenance
  • 2015 February – Excavation of test holes
  • 2016 June – Stage 1 earthworks for quarry extension – 15,550m3 earthworks for establishing site, removal of trees & vegetation
  • 2017 June – Stage 2 earthworks for quarry extension – 11,500m3 earthworks, removal of trees & vegetation, demolition, drainage

Location
Main Road, Otaki

 

Horokiwi Quarry Overburden Stripping

In general works consists of preparing area for overburden, vegetation clearing, strip topsoil, and excavate and haul overburden from quarry face to waste area.

  • 2012 – 185,000 m3 overburden strip
  • 2011 – 105,000m3 overburden strip
  • High level of safety is maintained at the quarry.
  • All quarry guidelines are adhered to.

Works all completed according to contract requirements.